Utility infrastructure
Case Studies

Utility deployments and performance highlights.

Real-world installations that demonstrate equipment performance, safety, and lifecycle value.

110kV Substation Upgrade

Switchgear, insulators, and surge protection delivered within 10 weeks.

33kV Distribution Resilience

Fuse cutouts and line fittings improved fault isolation across 120km network.

Urban Cable Retrofit

MV separable connectors and joint kits reduced outage time by 35%.

Coastal Insulation Program

Composite insulators increased service life in high-humidity regions.